Search:
Phone:86-516-83306288
Fax:86-516-87778228
mobile:(0)13705209318
(0)13905217915
(0)13705208238
Address:Xuzhou Economic Development Zone Tongshan Third Industrial principal Hing
Home >> Show >> Main body

Show

Belt conveyor turning device Fengfeng Bureau ox Colliery (recovery under Win)

Release date:2012-11-6  information:The Xuzhou mine Tianke Mining Technology Co., Ltd.

Fengfeng Bureau ox Colliery is a modern mine annual production capacity of 1.5 million tons. 2003 mine plan for the the rail transportation transformation of the original recovery transport Lane belt transport, due to the complex geological conditions, the transport Lane variable slope change to the following specific conditions, distance: 420m, traffic: 300T / h, with speed : 1.6m / s, Bandwidth: 800mm. Transport line in figure I. Complicated due to the variable slope change to the presence of, the original transport system, a belt conveyor to be able to solve the transport distance, two belt conveyor lap is now going to be completed. This will greatly increase the cost of production.
After extensive research, the use of Xuzhou Tianke Machinery Manufacturing Co. the production of B8075Y belt conveyor turning device. Secondary concrete pouring mounting way. So only one belt conveyor to complete the transportation task. Specific arrangement shown in Figure.
Corner transport belt conveyor turning device can replace multiple conveyor lap, reducing the number of equipment layout Face coal system, reduce leasing costs; less playing equipment cavern, reduce production costs; reduce the total installed power of the coal transport system, reduced operating costs; simplify the transportation system, and improve the reliability of the transit system. Very impressive field practice has proved effective. Due to the application of the belt conveyor turning device, shorten the the roadway construction time and installation time. At the same time, the belt conveyor turning device structure is simple, less wearing parts, and easy to replace, and little maintenance, operates under pressure with the role, avoid streamers, can better ensure fully mechanized mining face production.
The transport system since March 2003 installation running, good running condition.